Learn about the process of generating and selling SRECs for rooftop solar owners.
Example: If a credit is generated July 2024, how long before it expires?
Monthly with one month lag from generation to payment
Solar
In 2019, Maryland passed a 50% RPS by 2030 and doubled the mandate for solar. Prices have since rebounded in the Maryland SREC market. However, the SREC market in Maryland is undergoing changes. The state Public Service Commission is proposing a program for in-state solar projects up to 2MW that come on line from 1 July 2024 to 1 January 2028. Qualifying projects would receive 1.5 SRECs for each megawatt-hour of electricity generated, rather than one SREC.
How to register for Maryland SRECs:
In Maryland, SREC eligibility goes back to the system’s interconnection date, so long as the system’s registration is submitted to the state within that same calendar year. Additionally, SRECs three years older or newer can be sold.
Systems smaller than 10kW AC in Maryland that do not have a revenue grade solar meter are eligible for production estimates.